بیجاری، م. ، و حجی، ر.(1384 ). برنامهریزی تولید با تقاضای احتمالی و محدودیت ظرفیت ، چهارمین کنفرانس بینالمللی مهندسی صنایع.
مهری، ب. (1387)، محاسبات عددی، تهران: آییژ.
Bijari M. ,Haji R.(2004)."The Single Period News- vendor Problem With Stochastic Initial Inventory" , International Journal of Engineering Science, 15,47-54.
Bitran G.R. ,Yanasse H.H.(1984)."Deterministic approximations to stochastic production problems", Operations Research , 32, 999-1018.
Gupta ,S.K.(1977)."Decision Rules in Production Planning" ,Decision Sciences, 8,521-533.
Guan Y., Liu T.(2010)."Stochastic lot-sizing problem with inventory-bounds and constant order-capacities", European Journal of Operational Research, 207, 1398–1409.
Hajek, B.(1995) ."Cooling schedules for optimal annealing" , Mathematics of Operations, 13,529-614.
Huang k., Kucukyavuz s.(2008)."On stochastic lot-sizing problems with random lead times" ,Operations Research Letters ,36, 303–308.
Khang D.B., Fujiwara O.,(1993)."Multi period network flow problems with service level requirements" ,IIE Transaction, 25, 2, 104-110.
Kirkpatrick,S.,Gelatt,Jr.C.D,Vecchi M.P.(1983). "Optimization by simulated annealing": ,Science,220,67-680.
Leachman R.C., Gascon A. (1988). "A heuristic scheduling policy for multi-item, single-machine production systems with time-varying tochastic demands", Management Science,34 ,377-390.
Leachman R.C., Xiong Z.K., Gascon A., Park K. (1991).Note: "An improvement to the dynamic cycle lengths heuristic for scheduling the multi-item, single-machine", Management Science ,37 (9) ,1201-1205.
Mula J.,Poler R., Garcı´a-Sabater J.P., LarioF.C. (2006). "Models for production planning under uncertainty: A review" , Production Economics,103,271-285.
Sox C.R.,(1997). "Dynamic Lot-sizing with random demand and non-stationary costs", Operations Research letter,20,155-164.
Sox,C. R.,Muckstadt, J.A.(1996). Multi-item, multi-period production planning with uncertain demand, IIE Transactions, 28, No. 891-900.
Sox, C.R., Jackson P.L., Bowman Alan, Muckstadt J. A.(1999). "A review of the stochastic lot scheduling problem", International journal of Production Economics,62,181-200.
Sox C.R., Muckstadt J.A.(1997). "Optimization-based planning for the stochastic lot scheduling problem", IIE Transaction,29 (5) ,349-357.
Tarim S.Armagan, G.Kingsman Brian(2004). "The stochastic dynamic production/ inventory lot-sizing problem with service-level constraints", International journal of production economics, 88,105-119.
TempelmeierH.(2007). "On the stochastic uncapacitated dynamic single-item lotsizing problem with service level constraints", European Journal Of Operational Research,181,184-194.
White,S.R.(1980). "Concepts of scale in simulation annealing" , Proceeding IEEE International conference on computer design,(Port Chester),646-651.
Zhang M.(2011). "Two-stage minimax regret robust uncapacitated lot-sizing problems with demand uncertainty", Operations Research Letters,39 , 342–345.